ISO 27001 asks a different question from most security frameworks. It does not ask whether you have MFA. It asks whether you have a system that decides which risks matter, picks controls to address them, checks that the controls work, and improves when they do not. MFA usually ends up in that system, but the system comes first. Teams that treat ISO 27001 as a control checklist tend to get surprised at the Stage 1 audit.
What the standard is
ISO/IEC 27001 specifies the requirements for an information security management system (ISMS). The current edition was published in 2022, and Amendment 1 (2024) added climate change considerations to the context clauses. The standard has two parts that matter for certification:
- Clauses 4 to 10: the management system requirements. Context and scope, leadership, planning (including risk assessment and treatment), support, operation, performance evaluation and improvement. Every one of these is mandatory.
- Annex A: a list of 93 information security controls. You compare your risk treatment against it, include what you need, and justify what you leave out.
Implementation guidance for each Annex A control is in ISO/IEC 27002:2022. It is a separate purchase and is not certifiable on its own, but it is the document your engineers will want when they ask what a control actually means.
Certification is done by a certification body that is accredited by a national accreditation body (UKAS in the United Kingdom, ANAB in the United States, DAkkS in Germany and so on). Accreditation bodies that are members of the IAF multilateral arrangement recognize each other's accreditations, which is why a certificate from an accredited body is accepted internationally. Unaccredited "certificates" exist and buyers increasingly check.
Step 1: define the ISMS scope (clause 4)
Clause 4 asks you to understand your context: internal and external issues, interested parties and their requirements, and from that, the boundaries of the ISMS. The scope statement ends up printed on the certificate, so it is worth writing carefully.
A good scope statement names the activities, locations and technology. For example: "The information security management system supporting the development, operation and support of the Example platform, delivered from AWS regions in the EU and US, including the offices in Lisbon and Toronto." A scope that is too narrow (one microservice) makes the certificate useless to buyers. A scope that is too wide (the whole group, including a hardware division) makes the audit long and expensive.
Document what is excluded and why, along with interfaces and dependencies: the cloud provider, outsourced IT, a parent company that provides HR.
Step 2: leadership and policy (clause 5)
Top management has to show it directs the ISMS. In practice auditors look for an approved information security policy, defined roles and responsibilities, and evidence that leadership provides resources and reviews performance. A policy signed by the CEO and a named ISMS owner with real authority covers most of this. Auditors will usually interview someone from leadership, so brief them.
Step 3: risk assessment and treatment (clause 6.1)
This is the core of the standard. Clause 6.1.2 requires a defined, repeatable risk assessment process. Clause 6.1.3 requires a risk treatment process. Both must be documented, and their results kept.
Risk assessment
- Set risk acceptance criteria before you assess. For example, a 5 by 5 likelihood and impact matrix with anything scoring 12 or above requiring treatment.
- Identify risks to confidentiality, integrity and availability of information in scope. Asset-based and scenario-based methods are both acceptable; scenario-based tends to produce fewer, more useful entries.
- Assign a risk owner to every risk. This is a named person with authority to accept or treat it, not a team.
- Analyse likelihood and consequences, and score each risk against your criteria.
Risk treatment
For each risk above your threshold, choose an option: modify it with controls, avoid it by stopping the activity, share it (insurance, contracts, outsourcing), or retain it. The treatment plan lists the controls, owners and dates. Risk owners must approve the plan and accept the residual risk, and auditors look for a record of that approval.
| Example risk | Treatment | Annex A controls |
|---|---|---|
| Former employee keeps access to a SaaS admin console | Modify | 5.18 Access rights, 6.5 Responsibilities after termination, 8.2 Privileged access rights |
| Customer data exposed through a misconfigured storage bucket | Modify | 5.23 Cloud services, 8.9 Configuration management, 8.12 Data leakage prevention |
| Primary cloud region outage | Modify and share | 5.30 ICT readiness for business continuity, 8.14 Redundancy, contractual SLAs |
| Laptop theft in a coworking space | Modify | 7.9 Security of assets off-premises, 8.1 User endpoint devices |
| Legacy reporting tool no longer supported | Avoid | Retire the tool; record under 5.9 Inventory of assets |
Step 4: the Statement of Applicability
The Statement of Applicability (SoA), required by clause 6.1.3 d), lists all 93 Annex A controls and records for each one: whether it is included, why (the risk, legal or contractual requirement it addresses), and whether it is implemented. Exclusions need a justification. "We have no physical office, staff work remotely and production runs in AWS" is a reasonable basis for excluding some physical controls; "not relevant" is not.
Keep the SoA versioned. Auditors will ask which version was current at a given date, and surveillance audits will look at what changed since last year.
The 93 Annex A controls in four themes
The 2022 revision reorganized the 114 controls of the 2013 edition into 93, grouped by theme rather than by the old 14 domains. Most changes were merges. Eleven controls were new.
| Theme | Controls | Examples |
|---|---|---|
| 5. Organizational | 37 (5.1 to 5.37) | Policies, roles, threat intelligence, asset inventory, access control, supplier security, cloud services, incident management, business continuity, legal requirements |
| 6. People | 8 (6.1 to 6.8) | Screening, terms of employment, awareness and training, disciplinary process, responsibilities after termination, confidentiality agreements, remote working, event reporting |
| 7. Physical | 14 (7.1 to 7.14) | Perimeters, entry controls, physical security monitoring, clear desk and screen, equipment siting, storage media, secure disposal |
| 8. Technological | 34 (8.1 to 8.34) | Endpoint devices, privileged access, authentication, malware protection, vulnerability management, configuration management, backup, logging, monitoring, network security, cryptography, secure development, change management |
The eleven new controls are worth calling out because they are where teams moving from the 2013 edition usually have gaps: 5.7 Threat intelligence, 5.23 Information security for use of cloud services, 5.30 ICT readiness for business continuity, 7.4 Physical security monitoring, 8.9 Configuration management, 8.10 Information deletion, 8.11 Data masking, 8.12 Data leakage prevention, 8.16 Monitoring activities, 8.23 Web filtering and 8.28 Secure coding.
Step 5: implement, document, operate (clauses 7 and 8)
Clause 7 covers resources, competence, awareness, communication and documented information. Clause 8 is operation: running the processes you planned, performing risk assessments at planned intervals or when significant changes happen, and carrying out the treatment plan.
The standard requires certain documented information. This list is where Stage 1 auditors start:
- ISMS scope (4.3)
- Information security policy (5.2)
- Risk assessment process (6.1.2) and risk treatment process (6.1.3)
- Statement of Applicability (6.1.3 d)
- Information security objectives (6.2)
- Evidence of competence (7.2)
- Documented information needed for operational control (8.1)
- Results of risk assessments (8.2) and risk treatment (8.3)
- Monitoring and measurement results (9.1)
- Internal audit programme and results (9.2)
- Management review results (9.3)
- Nonconformities and corrective actions (10.2)
On top of these, many Annex A controls imply their own documents, such as an access control policy, an incident response procedure or a supplier register. Write these to match how you work. A two-page procedure that people follow beats a twenty-page one they do not.
Leave time for the ISMS to run before Stage 2. Auditors want records: completed access reviews, incident tickets, training records, a supplier review or two. There is no fixed minimum period, but a few months of operating records is a common expectation.
Step 6: internal audit (clause 9.2)
You must audit your own ISMS against the standard and your own requirements, using auditors who are objective and impartial. In a small company that often means an external consultant or a trained employee who does not audit their own work. The audit programme should cover all clauses and the applicable Annex A controls over the certification cycle, with a full pass before your first Stage 2.
Findings from the internal audit go into your corrective action process (clause 10.2): record the nonconformity, find the root cause, fix it, and check the fix worked. An internal audit that finds nothing at all tends to make external auditors look harder.
Step 7: management review (clause 9.3)
Top management reviews the ISMS at planned intervals. Clause 9.3.2 lists the inputs: status of actions from previous reviews, changes in internal and external issues, changes in needs of interested parties, performance feedback (nonconformities, monitoring results, audit results, objectives), feedback from interested parties, risk assessment results and treatment status, and opportunities for improvement. The output is decisions on improvement and any changes needed.
Keep minutes that follow that list. An agenda with each input as a heading makes the record easy to audit, and it makes the meeting itself more useful.
Step 8: Stage 1 and Stage 2 audits
| Stage 1 | Stage 2 | |
|---|---|---|
| Purpose | Check documentation and readiness for Stage 2 | Assess whether the ISMS is implemented and effective |
| Focus | Scope, policy, risk methodology, SoA, internal audit and management review records | Interviews, sampling of records, control testing across the scope |
| Typical output | Areas of concern that could become nonconformities at Stage 2 | Nonconformities (major or minor) and a certification recommendation |
| Gap between them | Long enough to fix Stage 1 concerns, commonly a few weeks |
Major nonconformities (a requirement not met at all, or a systemic failure) must be closed before the certificate is issued, which usually means evidence of correction and sometimes a follow-up visit. Minor nonconformities need an accepted corrective action plan. Audit duration depends on the number of people in scope and the complexity of the organization; certification bodies calculate it from rules set for accredited bodies, so quotes from different accredited bodies should be broadly comparable in days.
Step 9: surveillance and recertification
A certificate is valid for three years. In years one and two, the certification body runs surveillance audits, each covering part of the ISMS plus the core requirements (internal audit, management review, corrective actions, changes). In year three, a recertification audit reviews the whole ISMS before the certificate expires.
Between audits, the ISMS should keep running: risk assessments when things change, access reviews on schedule, internal audit and management review each year, corrective actions tracked to closure. Surveillance audits check exactly this. If you only touch the ISMS in the month before the auditor arrives, it shows.
Common reasons first certifications slip
- Scope written to minimize audit days, which then excludes the product buyers care about.
- A risk register with no owners, or owners who never approved the treatment plan.
- A Statement of Applicability that excludes controls without real justification.
- Internal audit or management review not completed before Stage 2.
- Policies copied from a template that describe processes the company does not run.
- No operating records, because controls were implemented the week before the audit.
How Varman helps
Varman does not certify you; an accredited certification body does. ISO 27001 is a prebuilt framework in Varman, and its controls are shared with other frameworks such as SOC 2, so evidence collected once counts toward both. Integrations collect evidence and re-run checks on a schedule, with failing checks shown against the affected control, which gives you operating records rather than a pre-audit scramble. Penetration test findings and phishing simulation results attach as evidence for vulnerability management and awareness controls. Readiness is tracked per framework, and the built-in agent can tell you which controls are failing or which tasks are overdue before your auditor does.
If you are planning ISO 27001 certification, book a demo and we will walk through your frameworks, which of your systems have an integration, and anything the platform does not do yet.
Frequently asked questions
How many controls are in ISO 27001:2022?
Annex A of ISO/IEC 27001:2022 lists 93 controls in four themes: 37 organizational, 8 people, 14 physical and 34 technological. You do not have to implement all of them; the Statement of Applicability records which apply and why.
Is ISO 27001:2013 still valid?
No. The transition period for certificates against the 2013 edition ended on 31 October 2025, so current certificates are issued against ISO/IEC 27001:2022.
What is the difference between Stage 1 and Stage 2?
Stage 1 reviews documentation and readiness: scope, policy, risk methodology, Statement of Applicability, internal audit and management review. Stage 2 tests whether the ISMS is implemented and working, through interviews and sampling of records.
How long is an ISO 27001 certificate valid?
Three years, provided the annual surveillance audits in years one and two are passed. A recertification audit in year three starts a new cycle.
Do we need SOC 2 if we have ISO 27001?
It depends on your buyers. Many North American enterprises still ask for SOC 2. Because the controls overlap, adding the second is much cheaper than the first. The SOC 2 compliance guide explains the report and its criteria.
See how Varman automates this for your team.
Book a demoKeep reading
NIS 2 compliance automation: what to automate under Article 21
NIS 2 compliance automation, measure by measure: which Article 21 controls a tool can check for you, what stays manual, and the evidence for 24h and 72h reporting.
NGINX HTTP/2 remote code execution bugs: what to patch and how to prove it
Two memory-safety bugs in the NGINX HTTP/2 module, CVE-2026-123007 and CVE-2026-123633, can let an unauthenticated attacker run code on the server. Fixed in 1.30.7 and 1.31.9. Here is who is exposed, what to do today, and the evidence your auditor will ask for.