Why Linear matters for compliance
Planning controls ask whether work is organized and tracked, not just done. For engineering teams that plan in Linear, the issue tracker is the record of what was prioritized, who owned it, and when it was finished. Auditors use that record to tie changes and security fixes back to planned work.
Varman connects to your Linear workspace and confirms at least one team exists to track work. If no team exists, the check fails and suggests creating one. It is a low severity check that feeds the Planning evidence task, which maps to SOC 2, ISO 27001, ISO 42001, HIPAA, NIST CSF, and NIS 2. Together with source control checks, it shows a planned and reviewed path from idea to release. Linear does not replace a change approval step, but it gives reviewers the context for why a change was made and who asked for it.
Linear checks in Varman
Verify work tracking is in place in Linear. Varman runs one check against Linear on a schedule and records each result as evidence.
Frameworks Linear evidence supports
In Varman, each check feeds an evidence task, and each task is mapped to requirements in the frameworks you run. Results from Linear count toward these 6 frameworks.
Connecting Linear
An admin adds the details below in Varman under Integrations. Secret values are encrypted before they are stored.
Vendor reference: Linear API documentation.
- API Key
- Settings > API > Personal API keys > create a key.
Linear questions, answered.
What access does Varman need to Linear?
A personal API key created in Linear under Settings, API, Personal API keys. The key acts as the user who created it and is encrypted before it is stored.
Is Linear enough for change management evidence?
The Linear check feeds the Planning task. Change management evidence for code usually comes from source control (branch protection and reviews in GitHub or GitLab). Linking Linear issues to pull requests helps auditors trace a change from plan to merge. Linear can link issues to GitHub and GitLab pull requests automatically when the issue ID appears in the branch name or title, which keeps that trail intact without extra work. Linear's own audit log is available on some plans.
Which frameworks does the Linear check count toward?
SOC 2, ISO 27001, ISO 42001, HIPAA, NIST CSF, and NIS 2, through the Planning evidence task. That task covers planning activity across your program, so Linear sits beside other planning evidence such as roadmaps and risk treatment plans rather than standing alone.
How often is the Linear check run?
It runs on a schedule. You can trigger it on demand from Varman as well. Because the check only needs one team to exist, it rarely changes once it passes. A failure usually means the key was revoked or belongs to a user who lost access to the workspace.